This new 50,000 square foot building houses a 1,400 seat worship auditorium, educational and office spaces. The shell is a pre-engineered metal building framing system supported by standard concrete foundations with concrete slabs on grade.
The roof system is pre-engineered metal building standing seam for the educational half of the building and a TPO membrane roofing system for the balance of the facility.
Exterior skin is brick veneer, Nichiha siding with storefront glass and glazing systems. Interior construction consists of metal stud and drywall partitions.
Complete MEP systems are included along with infrastructure for state-of-the-art audio/visual/lighting systems.